About the Project

Project aimed to provide 24 hours’ water supply to more than 1000 inhabitants of Anaklia and Ganmukhuri villages, it was successfully achieved. Within the project frame we constructed reinforced concrete circular reservoir with capacity of 3500 m3, chlorination and pumping stations. Following works were performed:

  • We made deep excavation and stabilisation of foundation pit
  • For smooth surface of the concrete we delivered circular formwork
  • We designed special mix for high strength concrete to assure high watertight and flexibility of concrete