About the Project

ICT – largest container terminal in Georgia, located in the north of Poti seaport. Construction was started in 2013 and finished within one year

Steel fiber reinforced concrete was used or terminal pavement. Concrete mix design was developed by our specialists together with specialists from Arcelor Mittal, supplier of fiber. At the end more than 40 000 m3 of SFR concrete was delivered and paved and for this we used more than 1,400 tons of steel fiber

In addition following works were executed:

  • More than 30 000 m3 of weak soil was replaced, are was dewatered, new soil was imported for ground raising and stabilization
  • Underground drainage was constructed
  • Electrical installation included more than 13 km of underground cable network and installation of 8 units of high voltage transformers
  • New lighting system was installed with 3 units of 45 m height masts and 3 units of 20 m height masts. Foundation of mast were built on precast concrete piles
  • New fence, buildings and steel canopy was constructed